Value of construction works performed under contract, by category of objects, 2008-2017
Tables
-
Dim Unit Of Measure, Value Of Construction Works Performed Under Contract By Category Of Objects 2008 2017TSV
Dimension Unit_of_measure (Unitatea de masura)
Column Descriptions
Dim Unit Of Measure, Value Of Construction Works Performed Under Contract By Category Of Objects 2008 2017
Column | Type | Comment |
---|---|---|
code | string | The code for the dimension value. Column code has 2 rows, out of which 0 are empty, making the null percent 0.00. The column is fully populated. Minimum string is 0 and maximum string is 1. |
label | string | The label for the dimension value. Column label has 2 rows, out of which 0 are empty, making the null percent 0.00. The column is fully populated. First 25 characters of minimum string: In percent as of total... and first 25 characters of maximum string: Million lei, current pric... |
orig_extractdate | string | The date when the data was originally fetched from the source. |
Additional Info
Last Updated | September 2, 2023 |
---|---|
Created | November 9, 2018 |